National Hub Overview
Performance and operational status across all Catmax hubs
| Hub | Status | Active Jobs | Revenue (Wk) | Blocked | Installers | Warehouse | Manager |
|---|---|---|---|---|---|---|---|
| Brisbane / HQ | Active | 42 | $96,800 | 4 | 6 | Healthy | Paul Chapman |
| Melbourne / Victoria | Trial Hub | 31 | $72,400 | 5 | 5 | Stock review needed | Daniel Reed |
| Sydney / NSW | Launching | 18 | $48,200 | 2 | 3 | Setup in progress | Sarah Milton |
| Perth / WA | Installer Network | 21 | $39,100 | 2 | 4 | Dispatch delays | Remote Ops |
| Adelaide / SA | Small Hub | 14 | $28,100 | 1 | 2 | Healthy | Local Partner |
Paul's Attention Required
Surfaced from across all hubs — items that would normally need to be chased manually
Customer changed design but final drawing was not uploaded.
Job sheet requires 100 stainless screws, but AI estimate suggests 42 based on install type.
Projected purchase requirement: $17,800 vs $15,000 weekly budget.
Card processing fees not matching invoice records for 12 transactions.
Operations Pipeline
Where every active job sits — and where the system is holding work back
AI Guardrail Summary
This weekAI Operations Summary
This week, most operational risk is concentrated in Melbourne and Brisbane. The most common blocker is missing installer drawings after site measures. Three warehouse releases were prevented because customer design changes were not reflected in the final job sheet. Recommended focus: tighten installer completion requirements and review Melbourne's stock ordering process before Friday.